Seasonal Commissioning
NC-v4 EAc1:Enhanced commissioningposted by komal m on
Is seasonal commissioning required or optional for proejcts? Is seasonal commisioning applicable for tropical areas, as there is hardly any seasonal variation observed throughout the year?
FSC Invoices, Chain of Custody, and Certified Wood Cost
CI-2009 MRc7:Certified Woodposted by Eric Thompson on
I'm working on a project in Norway and I'm somewhat confused about the documentation for Certified Wood. The Reference Guide states: Collect all *vendor* invoices for permanently installed wood p
Area used in calculation?
NC-v4 LTc7:Reduced parking footprintposted by Dave Hubka on
When registering a project in LEED Online the gross floor area is used. Gross floor area is calculated from the exterior walls. https://usgbc.org/glossary#gross-floor-area-gfa
Hazardous ingredients
NC-v4.1 MRc4:Material Ingredientsposted by Aleksandra Suchomska on
If a manufacturer provides an inventory of all potentially hazardous ingredients (up to 100ppm) but omits ingredients that pose no risk and does not list them, does the report qualify for Option 1
LEED ND GIBp1 - WELL Building Certification
ND-v4 GIBp1:Certified green buildingposted by Jennifer Bryant on
Would certification of buildings within the masterplan under the IWBI's WELL Building Standard V2 be sufficient to fulfil the requirements of this credit?
Baseline SFP for tenant fan-coils
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear all,
Cx scope for ventilation, air conditioners of the base building
CI-v4 EAp1:Fundamental commissioning and verificationposted by Michael on
My store project is located inside a big department store in Japan. All HVAC system in my project is controlled by the landlord of the base building.
Data cabling and carpet quantity difficulty
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Deb Favaretto on
The language of the Pilot Credit now requires Communications (data cabling).