Forum quick links
How to account for telecommuters
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Maria Unruh on
This might not be the most appropriate credit category to ask this question but it does affect the calculations for this credit. Our project has 21 full time telecommuters.
Zones for a small CI 2.0 Project
CI-2009 IEQp1:Minimum IAQ Performanceposted by Greg Hackett on
We have an office project (LEED CI 2.0) in an exsitng small building about 3500 s.f. The building is served by one existing central system that provides OA to the space.
Renovation versus Demolition
NC-2009 IDc1:Innovation in Designposted by sara frye on
After much research and discussion it was decided to renovate an extremely decrepit farmhouse, portions of which date back to the 18th century.
registration
posted by Esmeralda Ward on
Hello, I received an email about this webcast and am interested, however there is no link to register. Is this only open to upgraded membership holders? thanks.
Option 2: Floor Area Clarification
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Shannon Terrell on
If my bay depth to core is deeper than 2 times the height of the window, is the area beyond 2H still part of the floor area calculation?
Flowing water Pressure for Kitchen Sink
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Yong Lee Low on
My project is a commercial building. All the fittings except Kitchen sink have been finalized.