We have a main, fire water and irrigation meter. If read weekly and calibrated properly we have what is needed to obtain 2 points in this credit. We have listed other submeters in the template because it asks for ALL submeters. These meters are installed in two restaurant/tenant spaces. The water used by these tenants does not account for a large portion of the building's potable water demand. My engineer thinks that because these submeters are not within the list of Option 2 meters they do not need to be read weekly. They are in the template (and the reviewer has seen the documentation once) so I'm thinking that as long as they are listed in the template they must be read weekly.