Future Building as a Shadowing Element
NC-2009 EAp2:Minimum Energy Performanceposted by Gabriela Crespo on
Dear all, We are working on a single building certification that is located within a two tower project.
Site Assessment- Design Phase?
Pilot-Credits SSpc45:Site assessmentposted by adi ashkenazi on
I looked in the "credit specific" but couldn't find if this credit can be submitted during the construction phase? I will appreciate your help and from your experience with this credit Thanks
ASHRAE forms
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
for commercial interior rating system The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.
ETS Signage Requirements
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Deborah Ebersole on
We submitted a project for review on a campus which prohibits smoking both in the building and the entire campus site.
Energy Star-labeled but outside the target products
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Takayuki Hirota on
We are going to purchase a new Energy Star-Labeled TV for the office. We can find TVs available as Energy Star-qualified in the categories shown in the Energy Star website.
Anti-corrosive system: VOC content of individual components
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Maya Karkour on
Dear all, The Contractor needs to install anti-corrosive paints / coatings for one project. The anti-corrosive system consists of 2 products (the first being an epoxy primer and the second being
In order to use an Energy
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Nelina Loiselle on
In order to use an Energy Star label for the streamlined path, the Label must have been awarded within 12 months of the LEED application submittal date.
Closed Pilot Credit
NC-2009 IDc1:Innovation in Designposted by Kate Levine on
Does anyone have experience with pursuing a closed pilot credit as an ID credit?
Task Lighting in Private Offices
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Crina Bosch on
This may have an obvious answer, but I confused on the task lighting for private offices.
Comprehensive Envelope Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Tim Rogers on
Is it still possible to earn Exemplary Performance by doing comprehensive envelope commissioning?