Future Building as a Shadowing Element

NC-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a single building certification that is located within a two tower project.

5
Thu Mar 6, 2014, 8:43 pm

Site Assessment- Design Phase?

Pilot-Credits SSpc45:Site assessment
posted by  adi ashkenazi  on 

I looked in the "credit specific" but couldn't find if this credit can be submitted during the construction phase? I will appreciate your help and from your experience with this credit Thanks

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Thu Mar 6, 2014, 4:28 pm

ASHRAE forms

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

for commercial interior rating system The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.

4
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu Mar 6, 2014, 3:07 pm

ETS Signage Requirements

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Deborah Ebersole  on 

We submitted a project for review on a campus which prohibits smoking both in the building and the entire campus site.

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu Mar 6, 2014, 3:06 pm

Energy Star-labeled but outside the target products

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Takayuki Hirota  on 

We are going to purchase a new Energy Star-Labeled TV for the office. We can find TVs available as Energy Star-qualified in the categories shown in the Energy Star website.

2
Thu Mar 6, 2014, 6:35 am

Anti-corrosive system: VOC content of individual components

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Maya Karkour  on 

Dear all, The Contractor needs to install anti-corrosive paints / coatings for one project. The anti-corrosive system consists of 2 products (the first being an epoxy primer and the second being

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Mar 5, 2014, 7:28 pm

In order to use an Energy

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Nelina Loiselle  on 

In order to use an Energy Star label for the streamlined path, the Label must have been awarded within 12 months of the LEED application submittal date.

5
President
AGR Consulting, LLC
LEEDuser Basic Member
14 thumbs up
Wed Mar 5, 2014, 5:31 pm

Closed Pilot Credit

NC-2009 IDc1:Innovation in Design
posted by  Kate Levine  on 

Does anyone have experience with pursuing a closed pilot credit as an ID credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 5, 2014, 3:21 pm

Task Lighting in Private Offices

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Crina Bosch   on 

This may have an obvious answer, but I confused on the task lighting for private offices.

4
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Wed Mar 5, 2014, 2:28 pm

Comprehensive Envelope Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Tim Rogers  on 

Is it still possible to earn Exemplary Performance by doing comprehensive envelope commissioning?

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Mar 5, 2014, 1:44 pm