Forum quick links
Self-contained classroom pods = regularly used entrances?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joyce Kelly on
Picture a University bldg. shaped to form a slot canyon to provide shaded access to the outdoors. Within the canyon, which includes doors to exit the courtyard, are a few small classroom pods.
Cruise Terminal FTE and Visitor/Transient count
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Sheryl Swartzle on
Our cruise terminal has a season from October 1 to April 15 when the FTE will be 155 and visitor/transient will be 2,000 per day for 3 or 4 days per week (the other 3-4 days per week it would drop
SSc4.2 / WEc3
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Bryan Pratt on
I am working on an expansion to an existing building that will be using existing plumbing fixtures to satisfy requirementst.
Task Lighting included?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by BEE Incorporations on
Hi, We are working on an office project outside the US and recommending the client install desk lamps as task lighting to increase controllability of lighting and reduce ceiling lighting energy l
Guestrooms Excluded?
posted by Ellen Mitchell on
Why are guestrooms excluded? It seems they should be in the same realm as dorm rooms or bedrooms.
Filtrations on milan wall
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
We were asked by a contractor about a project where the milan wall (structural soil estabilization) is having some water filtrations. The product will be applied on a milan wall (concrete wall) th
App G Baseline HVAC Zones
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi, I am working on a large building which is part theater, part convention center and part exhibitions halls + ancillary spaces. The baseline system is system type 7.
Playing fields exclusion
NC-2009 WEc1:Water Efficient Landscapingposted by FRAGKISKOS LEVANTIS on
Projects other than Schools: Can they exclude playing fields in certain credits just like Schools can?
Submetering for AHUs with multiple tanents
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Jatuwat Varodompun on
We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor. 1.
Future space
CS-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
In case of project with an area which is already designed but yet built (less than 40% of gross project area), can we use "owner's commitment" instead of "leasing agreement" to state all the design