PIf2 form filling

CI-2009 MPR7:Must comply with a minimum building area to site area ratio
posted by  Lorenna Lobo  on 

While filling the PIf2 form, in "site characteristics" it asks what is the total site area within the LEED project boundary, but the project is just a tenant space, should I put 0?

0

ID Credit for CSv 2009 Project

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  José Solis  on 

Is it possible to use this credit as an ID credit for a CS v2009 project? Could we achieve it if we write the requirements into the tenant lease language or the binding tenant requirements?

1
Tue Mar 22, 2016, 10:21 pm

Same Landscaped Area but Different Plantings?

CS-2009 WEc1:Water Efficient Landscaping
posted by  Brian Salazar  on 

I should know this, but.... Is it OK to run the WEc1 calcs with the same landscaped area (in square feet), but with different plantings in the baseline and design cases?

1
Mon Apr 18, 2016, 7:16 pm

All water reduction through recycling

NC-2009 WEc3:Water Use Reduction
posted by  Melissa Merryweather  on 

I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p

0

manage (rainwater) on site

NC-v4 SSc4:Rainwater management
posted by  Manuel Martin Delgado  on 

Hi, Is reusing rainwater for flushing toilets an accepted solution for achieving this credit? Or is reusing for irrigation the only solution accepted? Thanks.

1
Wed Mar 23, 2016, 8:09 pm

Minimum Unloading Ratio for baseline

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

For chillers in EnergyPlus I have to provide the data “Minimum Unloading Ratio”.

1
Wed Mar 23, 2016, 3:41 pm

Gerrymandering

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kath Williams  on 

Our project preliminary review points toward gerrymandering the LEED project boundary. It is a golf course clubhouse with geothermal pond on an existing putting green and paths.

0

Historic Bldg Renovation being done in phases, C&D Waste calcs

NC-2009 MRc2:Construction Waste Management
posted by  Debra a. Lombard  on 

I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.

1
Mon Mar 28, 2016, 10:31 pm

Historic Bldg Renovation being done in phases, Bldg reuse calcs

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Debra a. Lombard  on 

I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.

1
Mon Mar 28, 2016, 6:39 pm

Shared Garage Situation

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  José Solis  on 

My LEED project will be using a garage that will be designed to serve multiple buildings.

1