Forum quick links
Certifying an exisiting building that is under construction for part of the performance period.
EBOM-v4.1 MPR3:Must comply with project size requirementsposted by Daniel Esposito on
If a project going for certification underwent construction retrofits for a significant portion of the performance period, does it still qualify for certification?
Infiltration rate @ 75 Pa (ASHRAE 2016) vs. 4 Pa / 50 Pa (Design Builder Software)
NC-v4.1 EAc2:Optimize Energy Performanceposted by Ziad Zeitoun on
Hello,
ASHRAE 2016 specifies the infiltration rate of the building at 75 Pascals (2.03 L/s.m²).
Existing Building with no water usage
EBOM-v4.1 WEc1:Water Performanceposted by Pulak Goyal on
I have an existing self storage warehouse in japan to be certified under LEED v4.1 EBOM. It has no regular occupants and no water fittings.
LEED EBOM V4.1 -Drawing details
EBOM-v4.1 MPR2:Must use reasonable LEED boundariesposted by Deva venkat on
hi sir /Madem/
Take into account Renewable Energy production in the close future from the certification
CI-v4 EAp2:Minimum energy performanceposted by Helena Garcia on
Dear GBCI team,
Building Entrance Vestibule Requirements
NC-v4 EAp2:Minimum energy performanceposted by Christopher Russell-King on
Hello! I have a question regarding the inclusion of Vestibules (double entrances to buildings to prevent heat loss), in a Court House building project we’re working on.
Measuring Chiller COP - LEED certification
CS-v4 EAp2:Minimum energy performanceposted by Shuvajit Batabyal on
Hello everyone.
German Energy Saving Law Certificate as Submittal
NC-2009 EAc1:Optimize Energy Performanceposted by Dandan Li on
Hello all, We have a LEED v2009 C&S project in Germany now.
LEED-focused part-time job
posted by Dan Piselli on
FXCollaborative is looking for part-time help completing in-house LEED documentation on a few projects.