Forum quick links
Continuous flush out?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Erin Holdenried on
For Option 1 Path 2, can there be a time gap between when the pre occupancy ends and post-occupancy flush out begins? Or does one have to immediately follow the other?
Recertification with new criteria
posted by Geoffrey Tomlinson on
A recently certified EBOM project will likely need to be recertified under LEED v4. How are they going to treat changes and or new credits during the performance period.
Division 12 in MR credits
NC-2009 MRc4:Recycled Contentposted by Joseph Ford, AIA on
I am wrestling with what this part of the MR credit overview says: "A project team may include materials costs from CSI MasterFormat Division 12 - Furniture and Furnishings as long as this is don
PI FORM 3 Version 4: Complex Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Curtis Clark on
Under "Complex Occupancy", it states to upload "PIf3-1" to calculate FTE. Is this a spreadsheet that we create or is there on on-line form?
Exterior LPD for Block Project
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
We registered a block project; the Campus boundary includes land scape, existing non-LEED buildings and two LEED certification candidate buildings.
Project Information (PI) forums
posted by Tristan Roberts on
LEEDuser now has a dedicated set of forums, including sample documents, for Project Information forms.
Exemplary performance for offsite land
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Heather Holdridge on
We are planning to donate offsite land to a land trust to gain earn this credit. This land will be equal to more than 75% of the previously developed area (including the building footprint).
Temporary purposes
CS-2009 MRc6:Certified Woodposted by Heather Holdridge on
The credit language mentions that the project team can include the FSC certified wood used for temporary purposes such as framing, scaffolding, etc. in the calculation.
Lighting power density of a Clinic
NC-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Dias on
Hello I'm working in a energy simulation of a medical clinic, where it is possible to make some types of exams and diagnoses, but it doesn't have spaces like intensive care or surgical areas.