Forum quick links
Equivalents in Europe
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mike D on
Hello Does anyone have experience or insight or whether other international standards can be used instead fo FloorScore? FloorScore is not widely available in Europe and thus we were wondering if w
ID for Smart Home System
NC-2009 IDc1:Innovation in Designposted by Tim Middleton on
Our project is mixed use, roughly 1/3 retail, 1/3 residential and 1/3 hotel. We want to apply for Innovation for the use of Smart Home systems in the residential part.
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled Contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???
Movie Theater Visitor Classification
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Norma Lehman on
Would patrons to the movie theater be classified as "transient" or "retail customer"?
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site Selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Kennel building type for Base Ratio Table
NC-v4 LTc7:Reduced parking footprintposted by Luís Vale on
Hi there,
Thermal Comfort for Renovation of Historically Significant Building
NC-v4 EQc5:Thermal comfortposted by Heather Zeto on
Our project is a "Major Renovation" project for a historically significant buidling within a historic district.
Dining hall on college campus
CI-v4 LTc2:Surrounding density and diverse usesposted by Laura Charlier on
Is a dining hall on a college campus considered one of the five categories? How does being a public dining hall impact credit compliance (compared to private dining hall i.e.
Information for Campus Project & Individual Building project
NC-v4 MPR1:Must be in a permanent location on existing landposted by Subrota Roy on
Hi, We have 3 building within same premises .we want LEED certification for 3 building.
Power factor
NC-v4 EAc3:Advanced energy meteringposted by Keith Robertson on
The credit states "Whole-building electricity meters should record the power factor, if appropriate."
How does one determine when it is appropriate to record power factor?