posted by  FRAGKISKOS LEVANTIS  on 

If I register today for EBOM 2009, can I switch in a couple of months to v4? And if yes, what is the cost of the switch? I want to run two gap analyses for my client, one for each version.

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Tue Nov 26, 2013, 4:06 pm

Certified Wood - Chain of Custody - Fabricator

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

Does the fabricator / manufacturer of a product that incorporates wood components have to be FSC certified in order for the wood components to count toward the certified wood portion of the MRc3 cr

3
Tue Nov 26, 2013, 1:36 pm

Polypropylene raised floor - does it need floorscore?

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Adriana Hansen  on 

Hi, My project is an office building and they want to leave to the tenants a polypropylene raised floor.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 26, 2013, 12:43 pm

Entry Mats: Interior or Exterior?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Saju Varghese  on 

Reading the reference guide, they say the following: "Incorporate permanent entryway system at all high-traffic exterior to interior access points to reduce...", also "employ permanent entryway sys

6
Default Avatar
Technical Director for Sustainable Design
M+W Group
LEEDuser Basic Member
16 thumbs up
Tue Nov 26, 2013, 2:33 am

Modeling the envelope

CS-2009 EAp2:Minimum Energy Performance
posted by  Alan Viale  on 

Two short questions about modeling the envelope: 1. For my proposed model, am I required to follow the tables from appendix A even when my project is outside the US?

5
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Tue Nov 26, 2013, 12:21 am

Share your lessons learned at Greenbuild

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Mara Baum  on 

I am co-chairing a Greenbuild presentation, "LEED for Healthcare: Lessons Learned from the First 3 Years".

2
Mon Nov 25, 2013, 11:04 pm

Centrally metering network

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Ron Dean  on 

I'm working on a residential project that doesn't have a centrally monitored metering network.

5
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Mon Nov 25, 2013, 9:18 pm

Regularly occupied

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Adrienn Gelesz  on 

Hi, according to ID#100000426 MADE ON 07/19/2010, the wording changed from: "In mechanically ventilated buildings, install new air filtration media in regularly occupied areas prior to occupancy.

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Mon Nov 25, 2013, 8:47 pm

53000 SF in LEED Boundary

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Saju Varghese  on 

We have been contracted to do the fundamental commissioning for a college building that we also designed.

6
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Mon Nov 25, 2013, 7:28 pm

Cant find 2.1(b) and c()

Homes-v2008 IDc2:Durability management process
posted by  david harrington  on 

4.Incorporate the measures from 2.1(b) and (c), above, into project documents (drawings, specifications, and/or scopes of work, as appropriate).

3
LEED for Homes Techincal Development
US Green Building Council
LEEDuser Expert
38 thumbs up