Forum quick links
v2009 Min. Performance Calculator - Service Hot Water Inputs
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
With reference to Service Hot Water should the following baseline inputs match the proposed; If not where can I find good guidnace on how these baseline inputs can be obtained.
RE: SSc5.1: It looks like a greenfield site but may not be???
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Joe Manganelli on
Hi All, I am working on a 200 acre site that looks like greenfield farmland.
shared waste area
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Agnieszka Rylska on
I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.
Small entryways
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Johansson on
Hello, What if a project has small retail stores on the bottom floor, less than 3m long, and the ground outside doesn't belong to the property owner but the municipality (and therefor not possible
Projects in California
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Brightworks Sustainability on
If local requirements are not as stringent as LEED requirements, are we still required to meet LEED requirements beyond local standards?
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
Interesting tools but too expensive
posted by Andres Schwarz on
From my point of view, I would have liked to actually use one of these tools, but each time I asked for pricing, we couldn't even think of using it, they were too expensive.
Increasing Baseline Static Pressure for Sound Regulations
Schools-NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect
Documents Required For pre-certification for LEED V4 Core Shell
CS-v4 MPR1:Must be in a permanent location on existing landposted by Aqrab Ali Rana on
I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an
IAQ Management Plan during Construction
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Marge Barradas Machin on
Dear all, According to your experience, how often would inspections should take place?