shuttle to public transportation

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  cathy keagle  on 

What are the requirements for the shuttle to public transportation? Does the shuttle have any size requirements? I assume it must run in morning and evening.

1
Wed Jun 8, 2016, 8:41 pm

IAQ Testing path option 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Nanechka Pagan  on 

Hi During construction preliminary review our team received a technical advice that states the following: " it does not appear was performed for each area of the building served by a ventilation s

1
Mon Jul 11, 2016, 9:35 pm

ACP / developer control percentage penalizes existing buildings?

CS-2009 EAp2:Minimum Energy Performance
posted by  Jareb Ketay  on 

I've done a number of Core and Shell models before, and always use the ACP calculator.

1
Thu Jun 9, 2016, 2:40 pm

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!

0

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!

1
Thu Jun 9, 2016, 3:30 pm

All open space that is counted toward this credit will be preser

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Agnieszka Rylska  on 

As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".

1
Tue Jan 17, 2017, 10:48 pm

access to medical point and massage point

NC-2009 IDc1:Innovation in Design
posted by  Agnieszka Rylska  on 

We are considering options for innovation credits.

0

Compliance for Corporate Interiors?

Pilot-Credits EQpc78:Design for active occupants
posted by  Rachel Bannon-Godfrey  on 

Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.

1
Thu Jun 9, 2016, 3:09 pm
1
Tue Jan 17, 2017, 10:17 pm

Option 3 tracking

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Tommy Linstroth  on 

It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?

1
Thu Jun 9, 2016, 6:34 pm