Forum quick links
shuttle to public transportation
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by cathy keagle on
What are the requirements for the shuttle to public transportation? Does the shuttle have any size requirements? I assume it must run in morning and evening.
IAQ Testing path option 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nanechka Pagan on
Hi During construction preliminary review our team received a technical advice that states the following: " it does not appear was performed for each area of the building served by a ventilation s
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum Energy Performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!
All open space that is counted toward this credit will be preser
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Agnieszka Rylska on
As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".
access to medical point and massage point
NC-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
We are considering options for innovation credits.
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
Leed Footprint exceeds leed Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Jorge Lopez de Obeso on
Hi, I'm having some problems with a project.
Option 3 tracking
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Tommy Linstroth on
It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?