LEED EBOM 2009 - EAP2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by K A on
Hi, I work on a tenant building -- each unit has it's own electrical and water meters - no other utilities are used.
heating section type
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a baseline system according to System 5. I am considering Table 6.8.1A in order to determine the performance of the DX cooling coils.
Well Said - Not All PVCs are Equal - Good Decisions are Required
posted by Louise Schlatter on
Tristan, Well said. What I got out of this is: 1. Not all PVCs are equal. We need to know more about the products we are using. 2. We need to weigh our options.
Path 4
CI-2009 SSc1:Site Selectionposted by Mike D on
Can the project achieve Path4 if there are no parking spaces within the building. The project is a zero lot line as well. Thanks!
Modeling a Commercial Kitchen
NC-2009 EAp2:Minimum Energy Performanceposted by September Silvers on
Hi, I am trying to model a dining facility and am finding it difficult to determine the best way to include the energy associated with the kitchen equipment.
Industry Scare Tactics
posted by Andrew Ellsworth on
Tristan, thank you for rationally analyzing the claims made by the PVC industry, and showing that - surprise, surprise - their statements are loaded with inaccuracy and written to intentionally mis
Furniture Packaging Waste
NC-2009 MRc2:Construction Waste Managementposted by Gavin Simone on
Our client is purchasing new furniture for a newly constructed building. We're using the LEED NC 2009 rating system.
Modeling a commercial kitchen
NC-2009 EAp2:Minimum Energy Performanceposted by September Silvers on
I am trying to model a commercial kitchen. I read through previous threads and found some helpful information on including fan power for this type of space.
Tenant Improvement as an EBOM Facility Alteration
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Andrew Carman on
Does a Tenant Improvement (payed for by the tenant, not the building owner) count as a facility alteration under EBOM?
Barrakcs with a kitechen considered LEED Homes or NC?
posted by Tongsu Han on
Barrakcs with a kitechen considered LEED Homes or NC? 1) My project is to renovate one barracks in US military base outside US States. It has three floors and 70 bedrooms with toilet.