Forum quick links
Natural Ventilation in Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal
SSc6.2 in urban areas
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by BH . on
Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a
District Energy Systems
NC-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
I have project that is purchasing chilled water from the local utility.
LEED CI - Scope of work required
NC-2009 PIf1:Minimum Program Requirementsposted by Michael Smithing on
Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?
LEED Scorecard Forms
posted by Clara Simon on
Thanks for the link to the 2009 scorecards. Can you please provide a link to past scorecards?
SSc6 - Site Improvement Plan
EBOM-v4 SSc6:Site improvement planposted by Levi Jimenez on
Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur
LEED Scorecard Forms
posted by Clara Simon on
I am attempting to post on the UW's website a consistent appearance of the scorecards earned on UW LEED projects, so that I can provide a link on each project http://f2.washington.edu/cpo/sustain/l
Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?
Sports Facility - 0 FTE's or 0 Transient Users
posted by Michael Heacock on
Can a new campus tennis facility be LEED certified if there are only transient users (ie. no employees, no office, only locker rooms)?
Option 2-Air Testing - Building with Phased Completion
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
We r building 424 residential units - 46 storeys high tower.