Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
EPA registered chemicals and new UL equivalent of CCD 146
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Pablo Fortunato Suarez on
My queries: A. Would procurement of EPA registered chemicals (not paper), as claimed by supplier, comply with LEED requirements for this credit & contribute to getting LEED points? B.
Outdoor water use to water mirrors in roof
CS-v4 WEp1:Outdoor water use reductionposted by Tobias Berge on
Is small water mirrors situated at the roof included in the credit? The architect has planned a few water mirrors close to a sky bar.
Slab on grade and concrete piers
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Thermal Comfort Control through BMS
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Gray Bender on
Hello, I am looking to understand if it would be acceptable to provide thermal comfort control only through a BMS system for a multi-occupant space.
Registration by Owner or Consultant?
NC-2009 PIf2:Project Summary Detailsposted by Vanessa Montezuma Ramos on
I am not sure if I am in the correct subject, but I did not find any answer or forum subject regarding this particular matter.
Reviewer's comment on MPR2
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Eric Bautista on
I am handling a new LEED building addition horizontally attached to a non-LEED existing building.
Showers?
CS-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?
Combination of Survey/Tracking
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jason Cocek on
The building I am working on has a shuttle service that brings employees to work from various city stops as well as local train stations.
Table Plf3-2. vs. Table Plf3-3
NC-2009 PIf3:Occupant and Usage Dataposted by Michael Kennedy on
We have renovation of a college building. Most of the building is made up of faculty offices with some waiting areas and conference rooms.