Forum quick links
"DES Energy Cost" Thread Follow-Up
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
In a previous post titled "DES Energy Cost" dating back to May 13, 2013, my interpretation of the responses in the thread is that a project can choose to either follow 90.1 or the DES Guidance from
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Toilet Partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
How would Toilet Partitions be accounted for? We are leaving a bathroom as is. Do we treat tlt partitions like cabinetry and count surface area? Or would they be considered 'furniture'?
residential kitchen - spray nozzle
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?
MR credit: Building Disclosure
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Francisca Herrera on
In relation to the Educational Session on EPD that you lead through USGBC, can you please tell me if the EPD compliant with LEEDv4 that you cover through this course, requires that the program unde
Data center Lighting - Building area method
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear All:- we are doing LEED NC project for data center which one is correct base case LPD for data center in building area method which lighting categories we take if we go with space by space m
Cooler and freezer storage
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mercè Llorca on
Hello, We are working on a project that is a combination of offices and food production.
Food Service Equipment
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Rachel Manoguerra on
I am working on a LEED for Healthcare v2009 project, and I'm wondering if I have to track food service equipment?
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
EAc1 Credits Using DES Option 1 + A lot of Renewables
NC-2009 EAp2:Minimum Energy Performanceposted by Reniel Barroso on
We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.