Forum quick links
site fence
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Agnieszka Rylska on
Are there requirements regarding specific fence type around the site?
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Compliance with WEp1 building that was constructed after 2007 bu
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by MKK LEED on
Hi, We have a project that is an existing building that was constructed in 2007, but it has water closets with greater consumption than 1.6 gpf (6lpf).
Lr value for refrigerant calculations
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Francisco Aguirre on
Dear all, I am currently working on a project with a VRF system. We have contacted the manufacturer for non-default refrigerant leakage rate values.
Supporting Documents for EAp2 and EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, I am working on a LEED 2009 NC project with IES energy modelling. Could anybody advise what documents need to be submitted for EAp2 and EAc1 certifications?
Dates of Documentation
CI-v4 MRp2:Construction and demolition waste management planningposted by Kerry Honsinger on
Does LEED track the dates of documentation that is required to be uploaded?
Trane TRACE's 40 plant limit.
Schools-2009 EAp2:Minimum Energy Performanceposted by Kelsey Rightmer on
The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.
Core & Shell without HVAC or electrical systems
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Celia Puertas Romero on
We would like to pursue LEED Core & Shell certification for a building undergoing a major renovation.
Construction final review acceptance
posted by Pedro Urazan on
Hi I just recieved the Construction final review for a project but when I try to accept the review, the following message appears: "Final acceptance is not allowed - Changed credits exists" Has
How to upload addition documents under MRc1 credit
posted by Catharina B on
Hi All Our project is registered under CS v2009.