Log in
Forum » NC-v4.1 MRc1
Topic

Inclusions in LCA model

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Dalia Abdalla on Aug 30, 2021, 6:48 am

Hello,

While conducting an LCA model under MR Credit: Building Life-cycle Impact Reduction, do we need to consider any considerably sized shading element / decorative...

Last reply: Bipin Karki, Aug 31, 2021, 8:38 am

Athena Structural Takeoff

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Monica Verastegui on Aug 4, 2021, 2:59 pm

I am doing LCA analysis for LEED by Athena. the building is modeled in Revit and I am getting the takeoffs from the model. My question is regarding columns and beams calculation. If we do have a...

LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by J Schütz on Mar 20, 2020, 9:02 am

Dear all,

as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it...

Last reply: J Schütz, Aug 5, 2020, 1:49 am