Topic | Recent |
---|---|
Measurement and Verification for v4 or v4.1NC-v4.1 EAc3: Advanced Energy Meteringposted by Mu'ath Ad on Oct 19, 2024, 6:12 am
Hi, is Measurement and Verification plan still required for v4 or v4.1? can someone brief what is required in this plan and in which credit to refer to for this plan? Thanks Last reply: Marcus Sheffer, Oct 19, 2024, 12:58 pm |
|
Mechanical LoadsNC-v4.1 EAc3: Advanced Energy Meteringposted by clinton cantrell on May 30, 2024, 1:03 pm
We are having a debate on the criteria. I understand requirement to meter any load that is 10% or more of the anual load but is metering the mechanical system as a whole capable of recieving the... Last reply: Marcus Sheffer, May 30, 2024, 5:01 pm |
|
Power factorNC-v4.1 EAc3: Advanced Energy Meteringposted by Jeyaraj Kaliranjan on May 6, 2020, 2:20 am
Is it nessessary to maintain the power factor or it is enough to record the power factor which is achieved by the project.? Last reply: Bipin Karki, May 6, 2020, 3:08 pm |