NC-v4 SSc6:Light pollution reductionposted by Jill Perry, PE on
Forgive me if this was covered elsewhere but I couldn't find it.
Demand Response on Campus applied to CI (2009) project?
NC-v4 EAc4:Demand responseposted by Margaret Montgomery on
We're doing a project that is >75% of the interior of the building (nearly all of it), but is considered CI.
EPD for Products + installation Materials, all as one?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Len Sciarra on
If we have a ceramic tile wall, do we count the EPD's (if we could get them) for the Tile separate from the Thinset and the Grout, or would all three products be considered as 1 EPD?
Access to quality transit
NC-v4 LTc5:Access to quality transitposted by Subrota Roy on
Hi, I want to know clearly what is Access to quality transit? Also how can i achieved this credit point for LEED NC v4. Pls share with me compliance path,what type of documentation needed?
Basic Difference between LEED V3 & LEED V4
NC-v4 MPR1:Must be in a permanent location on existing landposted by Subrota Roy on
What is Basic Difference between LEED V3 & LEED V4 ? What things has been incorporated in LEED V4?
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
Doubts in Green power & REC
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the
working in certified campus
posted by sara m on
if I am working on a new project that will be located in a gold certified campus; does it mean the new project will be gold certified?
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..