Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Conflict of interest?

NC-v4 EQc4:Indoor air quality assessment
posted by  emily reese moody  on 

Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?

1
Thu Aug 17, 2017, 11:22 pm

Steel Studs vs. Track

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Johanna Scogin  on 

Does the steel stud count as different material than the track?

1
Sat Aug 26, 2017, 1:31 pm

New LEED building within existing LEED project site boundary

LEED Guidance for Campuses and Multiple Buildings
posted by  Krissy Buck Flickinger  on 

I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.

1
Thu Aug 17, 2017, 10:26 pm

Railway station

ND-v2009 NPDc7:Transit facilities
posted by  Noriko Nagazumi  on 

Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.

1
Fri Aug 18, 2017, 3:30 pm

Mixed Mode Ventilation for Apartment Kitchens

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Neil Sen  on 

We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.

1
Sun Aug 27, 2017, 10:56 pm

Existing Chillers in Basement (not in project boundary)

CI-v4 EAp3:Fundamental refrigerant management
posted by  Heather Zeto  on 

Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).

1
Mon Aug 28, 2017, 10:14 pm

LEED HC (major renovation) or CI (v4)?

LEED Rating System Selection
posted by  Heather Zeto  on 

I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.

1
Sat Aug 26, 2017, 7:32 pm

Exemplary performance documentation

NC-2009 MRc2:Construction Waste Management
posted by  Kavita K  on 

Working on a project which is using NC 2009 version. We have to submit for construction preliminary review, We have achieved 97% const.

1
Fri Aug 18, 2017, 7:55 pm

District calculation

Retail-CI-v4 EAc5:Enhanced refrigerant management
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, After reading "further explanation" section of the Reference Guide (page 201) we are wondering how calculations should be made for a district plant where the commercial interior is served b

1
Tue Aug 29, 2017, 3:39 pm