Forum quick links
Tracking / documenting items being reused from demo'd bldg
NC-2009 MRc2:Construction Waste Managementposted by Renee Shirey on
On our site we have several items that will be salvaged from our demo'd building/site (furniture, playground equipment) that will be used with the new building/site.
Non-Energy Star Rated Products
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Matthew Macko on
How do you count products that are not rated by ENERGY STAR, like microwave ovens? Can you exempt them entirely from the total cost of durable goods?
Construction Waste Theft!
NC-2009 MRc2:Construction Waste Managementposted by Jeffrey Westall on
We are having a serious issue with all of our metal scrap being stollen from the jobsite dumpster. This has impacted our percentage for recycling dramatically. We are currently at only 28%.
Trees
NC-2009 MRc2:Construction Waste Managementposted by Norma Lehman on
We are removing a lot of trees on our construction site, if we turn it into mulch does this qualify toward our CWM credit? or would it be material reuse? thanks for your help!
Restrooms removed from scope of work
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Laurie Hughet-Hiller on
I've read all the comments here, but I'm still at a loss. I have a 3-building campus project in which one building is LEED CI and the others are LEED NC.
Using Appendix A of ASHRAE 62.1-2007
NC-2009 IEQp1:Minimum IAQ Performanceposted by Karen Stewart on
Has anyone ever used the alternative compliance option for this prerequisite by following Appendix A of ASHRAE 62.1-2007?
Automobile Service Garage
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Erin Adkins on
In an automobile service garage with 25 "stations" (there are not 25 employees, but worst case, I am assuming LEED will require each lift to be considered a "workstation").
Parking Garage ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Robert English on
I am designing the truck bays at a fire station. The arrangement most closely resembles a parking garage.
Pre K and K school question
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Sara Sweeney on
I had perviously contacted GBCI regarding which rating system to use for this project, back in Summer 2010, which is a small Early Childhood Learning Center for 4 and 5 year olds and was told to us
Storage Rooms as Critical Zone using 62MZ Spreadsheet
NC-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I have received review comments from a LEED Review Team questioning the results of the 62MZ spreadsheet which identified a Storage Room as the "Critical Zone".