Forum quick links
PI form 2 vs Energy Simulation Floor Area
NC-2009 EAp2:Minimum Energy Performanceposted by Leandro Silva on
We have a conflict between the LEED floor area which clearly excludes underground parking (in our case) and the area of the energy simulation.
Separate lighting and plug load sub-metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Magnus Stagnäs on
Our client’s CS-project has been denied EAc5.2 because we haven’t provided separate sub-metering of tenant lighting and plug loads.
Hotel System 2 Reheat
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Angell on
I am currently modeling a hotel with less than 20,000sqft (specifically 19720) of non-residential space.
Group Project Grandfathered in as a single building
posted by John McLean on
We registered a project in 2009 as a single building prior to the publications of campus/multi-building application guide even through it is three buildings.
Interrupted view
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Frantisek Macholda on
Hello, we have project with facade consisting of horizontal lamellas and glazing between them - like steps. The glazing is almost from a floor to ceilings.
Lease Language
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Stella Hodgkins on
Does anyone have recent experience with this credit (GBCI review comments), as it relates to lease language?
Appropriate baseline for a 6-storey commercial building
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Hello! We have a project with a 36,000 sq ft GFA and will use HVAC Variable Refrigerant Flow System. For the energy simulation we used equest software.
Group 2 requirements for Gypsum Wall Board
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
Does Gypsum Wall Board comply with the testing and product requirements of California Department of Public Health Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissi
Linear Metal Ceiling
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
Does a linear metal ceiling product have to comply with the testing and product requirements of California Department of Public Health Standard Method for the Testing and Evaluation of Volatile Org
Flush out in climate zone 1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Adi Negara, LEED AP BD+C on
Hi, does anyone here have ever implement flush out in a tropical climate area (climate zone 1 --> high temperature and humidity) and succeed obtaining this credit point?