Forum quick links
4 Buildings and 1 maintenance building excluded
NC-v4 EQc4:Indoor air quality assessmentposted by Summer Gorder on
There are 4 biuldings being LEED certified, and one maintenance building. We did not include the maintenance building, but it is being questioned.
Common comments in review phase
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Diana Rueda on
Were there any common reviewer comments or documentation challenges that I should be aware of before submission?
Onsite Carbon Sequestration Through Plantings - Pilot credits - SSpc158
posted by Evan Constant on
Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered by all trees and shrubs on the proposed site is at a minimum a 10% in
All Gender Restrooms - Conversations with Project Teams
Pilot-Credits WEpc147:All-Gender Restroomsposted by Annalise Dum on
What have teams found as successful ways to integrate all-gender restrooms into their projects?
MRpc87 Verified Waste Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Michelle Rosenberger on
I am not sure that diversion rates are any better using the RCI facilities.
Monitoring Systems for Commercial Interiors projects
Pilot-Credits LTpc134:Advanced Transportation Monitoring Systemsposted by Jose Antonio Kovacevic on
Hi everyone, we are searching for pilots credits for a corporative office that wants to pursues LEED ID+C certification in a certified LEED BD+C Core and Shell Gold project.
Integrative Analysis of Building Materials - LEED v4 CS
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Jessica Glorius-Dangelo on
I found the information relatively easy to find with the documentation provided by the product manufacturers.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
Path 2 Envelope Loads - What software to use?
NC-v5 EAc2:Reduce Peak Thermal Loadsposted by Mark Benson on
The Reference Guide says that you must follow the 90.1 Section 5.6 Building Envelope Trade-Off Compliance Path and then extract system peak heating and cooling loads from the modeled outputs for th