Forum quick links
Unfinished Tenant Spaces
NC-v4 EQc8:Quality viewsposted by James Keohane on
Working on a NC v4 project that has unfinished spaces with no ceilings or HVAC. The exterior glazing and building envelop is complete. To put this into perspective about 85% of the
LEED v4 ID&C Individual or Campus or Group?
posted by Erin Rowe on
Hi - I'm working with a "campus" project with two buildings on the same site, same construction timeline, same design.
Exterior Noise
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Marcus Sheffer on
Regarding the exterior noise requirements - are projects required to implement acoustical solutions to exterior noise in accordance with ANSI Standard S12.60–2010?
Energy Model Building Split
Healthcare-v4 EAp2:Minimum energy performanceposted by Junaid Naseer on
Hi,
Minimum Daily Transit Service Threshold
NC-v4 LTc5:Access to quality transitposted by Mark Norris on
Hi,
Natural Ventilation monitoring systems?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Avideh Haghighi on
Hello, we have a project that is naturally ventilated, but doesn't have direct exhaust airflow (offices are ventilated through a central atrium, atrium is naturally ventilated with gravity ventilat
How to demonstrate the materials are reusable or recycable?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Ameet AA on
The LEED language reads: