Forum quick links
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Existing Building Envelope does NOT Meet ASHRAE 90.1-2007
CI-2009 EAp2:Minimum Energy Performanceposted by James Keohane on
How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?
Airflow testing service
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Saul Pichardo, AIA on
Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M project.
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE of unoccupied gutted adjacent tenant
posted by Andrew Bennett on
under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors