Forum quick links
Completed scope of Cx cycle prior to date of application
EBOM-v4 EAc3:Ongoing commissioningposted by Christian Bösselmann on
Hi
We´d like to prove implementation of the EAc2.3 in an Office Tower according to LEED O+M v4.
Inconsistent expectations
NC-v4 IPc1:Integrative processposted by Martha Norbeck on
To the USGBC staff who I know read these comments, please issue consistent guidance for how this credit will be evaluated. I've submitted twice for this credit.
Phased project implementation
NC-2009 EAc5:Measurement and Verificationposted by Tim Murray on
We have a phased higher education project in which a new building addition will be built first, then the existing buildings will be renovated and open a year later.
Modeling CAV systems in system 9
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
I wonder of modeling CAV system in Baseline System type 9. My proposed building is storage with thermostat setpiont 12 C ( 54 F) with natural ventilation.
The New Trend in Split Design Packages
posted by Sarah Gudeman on
Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's...
CHP Modeling patch confusion
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Natural Ventilation: LEED Energy modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Sadaf Alam on
Dear all,
Service Water Heating DHW flow rate in the v4 Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by on
We are working on a large hotel, and are concerned with the "Modeled DHW Flow Rate gallons/minute" results we are getting from the "Service Water Heating" portion of the calculator. We've dou