Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

D & C Team perform Commissioning, CxA only Verifies?

NC-2009 EAc3:Enhanced Commissioning
posted by  Adrian Arenas  on 

Our project is pursuing Enhanced Cx credit v2009.

0

Min. Number of Fixtures

NC-v4 WEc2:Indoor water use reduction
posted by  Cora Kenrick  on 

Hello Fellow Users,

 

Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.

 

3
Energy Engineering Specialist
LEEDuser Basic Member
0 thumbs up
Tue May 1, 2018, 10:15 pm

materials not used in the original construction are verified in the re-evaluation of the certification?

LEED Recertification: When and How
posted by  ANDREZA PASSOS  on 

I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue May 1, 2018, 4:38 pm

BITuser experts

BITuser
posted by  Andrea Lemon  on 

I'm working on the Best Practice pages, and I want to verify the role of "BITuser experts" (analogous to LEEDuser experts, as shown on

6
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Tue May 1, 2018, 4:23 pm
0

Credit Review

CS-v4 INc2:LEED Accredited Professional
posted by  Luis Fretes  on 

Can we submit construction credits for review during design?

1
Thu May 17, 2018, 1:15 am

parking garage

EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distribution
posted by  Alison Rizzo  on 

Does there have to be a MERV13 filter on makeup air units supplying outdoor air for parkade exhaust?

1
Tue May 1, 2018, 7:11 pm

Landscaped area on a podium

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lindsay Duthie  on 

My project consists of some landscaping at grade (2%) and the majority of landscaping on the podium level (18%) for a combined landscaped area that is about 20% of the site. 

1
Wed May 2, 2018, 6:21 am

Furniture refurbishment - 30%

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Kriss Kokoefer  on 

How do I find out if any certified companies have received a point for refurbished furniture?  The point is awarded if 30% of the furniture or furnishings are refurbished, reused or salvaged.&

0

Enhanced strategies: CO2 monitoring for spaces served with ERU & 100% OA

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Sue Bryant  on 

For this option, all densely occupied spaces have to have CO2 monitoring that is tied into the central BAS. Is there an exception for spaces that are served with 100% outside air?

0