Room Geometry Adjustment - Baseline Lighting Power Increase

NC-v4 EAp2:Minimum energy performance
posted by  Luis Andrade  on 

Hi,

When modeling the Baseline's lighting power using the Space-by-Space method, may I icrease the Baseline's power by section 9.6.3 (Room Geometry Adjustment) by 20% ( if applicable)?

1
Thu May 24, 2018, 1:44 pm

metal door in factory-finished metal product exception?

NC-v4 EQc2:Low emitting materials
posted by  Charline SEYTIER  on 

Hello,

We have a question concerning the exception in Wall and ceiling categories on 'factory-finished metal product':  

11
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Wed May 23, 2018, 4:23 pm

photocatalytic air cleaning surfaces

NC-v4 INc1:Innovation
posted by  Henrik Sarfelt  on 

Is there a possibility that photocatalytic surfaces will give LEED points?

2
Design Engineer
LEEDuser Expert
19 thumbs up
Wed May 23, 2018, 2:30 pm

Excluding reuglarly occupied areas

CS-v4 EQc4:Daylight
posted by  Jens Apel  on 

I know there is a must in the rating system variations; but is there any chance in C&S to exclude areas that are defined as regularly occupied?

3
Wed May 23, 2018, 12:12 pm

Monitoring and alarms

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Jens Apel  on 

For balanced constant volume 100% OA systems it is sufficient to install current transducers or similar monitoring devices.

1
Mon Nov 19, 2018, 2:54 pm

Requirement (p). Limited sidewalk intrusions

ND-Plan-v4 NPDc1:Walkable streets
posted by  Nuttanee Vongveeranonchai  on 

Hi all, I have a question about at-grade crossing in LEED ND V.4 Walkable Streets credit.

1
Wed May 23, 2018, 1:56 pm

Efficient Refrigeration Equipment

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from effic

5
Default Avatar
Principal Engineer
HSA Engineering
LEEDuser Premium Member
5 thumbs up
Tue May 22, 2018, 4:32 pm

Sustainability job at Microsoft/CBRE

Green Commons
posted by  Nadav Malin  on 

Hi folks,

In case you know someone who might be right for this Seattle-area gig:

0

How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Nishank Shah  on 

I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.

4
Tue May 22, 2018, 3:14 pm