Forum quick links
Language of Documents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catalina A on
Does anyone know how the documents and technical specifications of the different projects (HVAC, Electricity, Lighting, hot water, etc.) have to be presented to the GBCI in terms of language?
Recycling Area
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Paul Diaz on
I was curious if there is a rule of the thumb for determing the qualifing recyling area square footage. The credit language seems ambiguous to me.
Questions on 75%?
Pilot-Credits PC19:Whole Building Reuseposted by Heather Walters on
We are finishing up documenation on a building which is on the National Register, went through review, recieved approval from the state, and earned historic tax credits.
The lease document is not in English
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Aaron Levey on
We have a 10-year lease but it is not in English. Do we have to translate the entire document? Thank you.
LEED baseline showerhead fixture for onsite tests
NC-2009 WEc3:Water Use Reductionposted by Nicolas Galiotto on
Hi all, We are planning to run some onsite tests to determine how water efficient are our showerheads.
Paper with no recycled Content
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Austin Evans on
Currently the paper supply that is used in the facility is from a Contract that Corporate has with Staples for copy paper.
Schools 2007 template
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Keelan Kaiser on
We are finishing up reporting on a school addition, and I have a few questions about the template. We are using the "calculation" option for both reverberation time and stc.
Layout for retail spaces
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Rubén M. R. on
Hi, I am working on a C&S building, it will be mainly occupied by offices and we have a proposed layout for those spaces.
What to include for Division 12 products?
CI-2009 MRc4:Recycled Contentposted by Louise Schlatter on
I am trying to calculate the total cost for CSI 2004 Division 12 products on my project. The owner has purchased many pieces of furniture, furnishings and miscellaneous items.
Glare control in CS projects
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Adriana Hansen on
Hello, We would like to clarify some questions regarding the credit EQc8.1 – Daylighting for buildings pursuing LEED 2009 Core&Shell certification in Brazil.