Industrial Flooring - Concrete Waterproofing / Sealer

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray). It would be installed on the concrete slab of a mechanical penthouse t

0

Building Foot Print

NC-2009 PIf3:Occupant and Usage Data
posted by  Ahmed Mosa  on 

We are currently working in the design of an iconic building that has 2 layers of facade.

1
Wed Jul 31, 2013, 7:17 pm

Submittal recomendation.

NC-2009 PIf3:Occupant and Usage Data
posted by  Daniel Garavito  on 

We are currently close to finishing all credit requirements. Do you recomend to submitt al information for review as it is completed or wait to have all ready and submitting it all at once?

1
Wed Aug 14, 2013, 9:50 pm

Discharge rates and run off

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Sean Hogan  on 

Hi, In simple terms, is there a difference between 'discharge rate' and 'run off'? We are currently assessing our site to determine which case and path to follow.

1
Mon Jul 29, 2013, 4:19 pm

Electricity Monitoring

Pilot-Credits PC38:Advanced Utility Tracking
posted by  Angela Loughry  on 

Would the intent of the credit be satisfied if only electric end uses were monitored - say plug loads, lighting loads, mechanical loads, and one appliance to get our four loads.

1
Wed Nov 6, 2013, 5:21 pm

Manufacturer information on SRI not available

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Magda Aghababyan  on 

I was looking for manufacturer data sheets to confirm the SRI for Zn-Al coated roofing (Silver color) but in Sri Lanka the suppliers do not have that information available. Can you please tell me

1
Tue Jul 30, 2013, 4:53 pm

Mixed strategy, windows and mechanical ventilation?

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Lise Dannesboe  on 

If I understand the intent of the credit correctly, we have to provide individual controls for every second FTE in individual spaces or open-plan offices.

1
Tue Jul 30, 2013, 7:08 pm

Scheduled pest management not a good strategy?

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Magda Aghababyan  on 

Is scheduled pest management activities (for example once a month) not an appropriate strategy under this credit?

1
Tue Jul 30, 2013, 3:26 pm

System narrative

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  ESD Singapore  on 

Hi all, I am currently working on a retail mall that starts operating from 10am to 10pm.

1
Wed Jul 31, 2013, 3:52 pm

Vacancy Sensor

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Would Vacancy sensors comply with the occupancy sensor requirement for classrooms, breakrooms and conference rooms under Ashrae 90.1-2007?

1
Tue Jul 30, 2013, 6:39 pm