Office kitchen to be considered as regularly occupied space for Daylight Analysis

NC-v4 EQc7:Daylight
posted by  Rajat Kumar  on 

We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don

0

BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENT

Schools-NC-v4.1 LTc5:Access to Quality Transit
posted by  Amal Venugopal  on 

The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1.

2
Default Avatar
Owner | Founder
EcoAmmo Sustainable Consulting Inc.
LEEDuser Basic Member
0 thumbs up
Thu Jul 18, 2024, 3:08 pm

Renewable Energy Calculator

NC-v4.1 EAc5:Renewable Energy
posted by  Mike Halcom  on 

We are contemplating changeing form LEED v4 to LEED v4.1 for renewable energy with a 100% owned PV system on-site.  Has anyone found the LEED Renewable Energy Calculator that is required to be

16
Project Manager, Architect
PGAL
LEEDuser Basic Member
0 thumbs up
Thu Jul 18, 2024, 1:16 pm

Baseline System 7 VAV - high Vot due to low Evz

CS-v4 EAc2:Optimize energy performance
posted by  Lenka Matějíčková  on 

Hi All, 

I would like to consult the derivation of the System Outdoor Air Intake (Vot) for baseline system 7 VAV under ASHRAE 90.1 - 2010.

2
Thu Jul 18, 2024, 1:05 pm

Regarding no refrigerant option

NC-v4 EAc6:Enhanced refrigerant management
posted by  Nagaraj Sankar  on 
The project having spaces without cooling systems.In this case can we purchase no refrigerant option to achieve this credit. Anyone please insists to move ahead on this scenario. Thanks in advance
3
Thu Jul 18, 2024, 1:29 am

EPD Option 2: Optimization

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Laura Ribeiro  on 

Hello everyone,

I am using some products that already have 2 versions of EPDs, and in the new version there is a table with the differences in relation to the previous EPD.

0
8
Project Manager, Architect
PGAL
LEEDuser Basic Member
0 thumbs up
Wed Jul 17, 2024, 5:56 pm

Joint Compound and Joint Tape - GREENGUARD Gold requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Jason Biondi  on 

Here is the technical advice we receive for one of the project:

8
Wed Jul 17, 2024, 5:50 pm

Hard-lid ceiling with access panel

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by     on 

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling?

0
8
Tue Jul 16, 2024, 1:56 am