Energy Model AND LEED Excel sheet required

NC-v4 EAc2:Optimize energy performance
posted by  Brandon White  on 

Are both required to be completed?  If so, one has to enter all the building information into compliant energy modeling software AND into the LEED Excel sheet?  That's ridiculous. 

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat May 11, 2019, 4:47 am

Baseline System Selection in LEED v4

NC-v4 EAp2:Minimum energy performance
posted by  Samer Hassanie  on 

This is in regards to Eap2 Minimum Energy Performance and Eac1 Optimized Energy Performance.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 10, 2019, 7:25 pm

Solar PPAs and Calculating Annual Energy Cost Reductions

NC-v4 EAc2:Optimize energy performance
posted by  Joshua Radoff  on 

All, I have a project that is looking to install a significant amount of solar PV on the roof of their commercial office project via a third party PPA arrangement.

13
Default Avatar
Energy & Sustainability Consultant
tk1sc
LEEDuser Basic Member
0 thumbs up
Fri May 10, 2019, 7:05 pm

Furniture Donations and Reuse

CI-2009 MRc2:Construction Waste Management
posted by  Kasey Kudamik  on 

We have a client that is building out a LEED-CI certified office space in a new location and will move from their current offices after the build out is complete.

4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri May 10, 2019, 4:56 pm

Attempting this Pilot as a Parksmart project Innovation

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Joanna Switzer  on 

Using the same approach I found successful on prior LEEDv4 projects (use of three Sherwin William's products with Manf prepared IABM compliance documentation), I am attempting to cross-reference an

1
Fri Oct 15, 2021, 1:50 pm

Gender neutral restrooms

NC-v4 WEp2:Indoor water use reduction
posted by  Anna Kaelin  on 

My project only has two water closets, one is back-of-house for employees only and one is for customers. Both are gender neutral.

1
Tue May 14, 2019, 5:00 am

Option 1 Requirements

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Yodi Danusastro  on 

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C.

1
Wed May 15, 2019, 6:13 pm
4
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu May 9, 2019, 8:47 pm

Other Buildings within LEED Boundary

NC-v4 SSc5:Heat island reduction
posted by  Max Krueger  on 

Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.

0