Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Small Sized printers

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sundararaj Subburaman  on 

I am working on a CI project, which requires small sized printers to placed in the floor area for particular working groups, do we have to consider the small sized printers to be placed inside the

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Sep 9, 2011, 10:10 pm

100% Municipal Non-Potable Water

NC-2009 WEc1:Water Efficient Landscaping
posted by  Michelle Rosenberger  on 

Our project will irrigate with a drip irrigation system using 100% municipally supplied non-potable water.

5
Fri Sep 9, 2011, 6:34 pm

Lighting Controllability in Restaurant Dining & Bar Areas

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Karla Fisk  on 

Has anyone ever had a restaurant NC project where you were able to come up with a method of controlling lighting in the dining/bar area? Were you able to achive this credit?

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Sep 9, 2011, 4:51 pm

Low Emitting Interiors - Move HC only criteria to all BD&C

General forums
posted by  Tom Lent  on 

There are requirements in this credit that originated in LEED for Healthcare due to the extra concern about health in its development.

3
Policy Director
Healthy Building Network
LEEDuser Basic Member
117 thumbs up
Fri Sep 9, 2011, 4:16 pm

Industrial buildings: EAc1 Optimize Energy Performance

CS-2009 EAc1:Optimize Energy Performance
posted by  Jane Long  on 

Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant.

4
Fri Sep 9, 2011, 3:42 pm
4
Fri Sep 9, 2011, 2:16 pm

Modeling OA for naturally ventilated space

NC-2009 EAc1:Optimize Energy Performance
posted by  Orlin Velinov, PE  on 

We have a project that is a parking garage structure.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Sep 8, 2011, 3:04 pm

Energy Modeling: Dome (Design) vs. Dome (Baseline)?

NC-2009 EAc1:Optimize Energy Performance
posted by  Nelina Loiselle  on 

I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome.

3
Thu Sep 8, 2011, 2:49 pm

SLL Credit 3 Reduced Auto Dependence

General forums
posted by  Peter Doo  on 

Requirements emphasize "existing" transit service. I assume that new transit service is negotiated as part of the project plan will also count. Please confirm.

2
LEED Faculty (ND), AICP, Senior Associate, Green Urbanism
Global Green USA
LEEDuser Basic Member
36 thumbs up
Thu Sep 8, 2011, 12:57 pm

green power for residential hi-rise

NC-2009 EAc6:Green power
posted by  Lorey Flick  on 

How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 7, 2011, 11:44 pm