Vegetation above underground rainwater harvesting tank

Data-Centers-NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Y Nguyen  on 

Hi all, My question is regarding a landscape area calculation for Data center project.

0

Does Option 2 apply to LEED for Retail?

Retail-NC-v4 EQc6:Interior lighting
posted by  Deborah Lucking  on 

Here is the Credit language "For at least 90% of the individual occupant spaces in office and administrative areas, provide individual lighting controls. In sales areas, provide controls that

2
Tue Mar 7, 2023, 1:00 pm

Offsite Renewables contributing to the energy model

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Dave Hubka  on 

Looks like we might begin to be able to claim offsite renewable energy systems within the energy modeling points.

2
Mon Mar 6, 2023, 7:56 pm

New Construction project with warehouse and bus parking

NC-v4 LTc8:Green vehicles
posted by  Dina El-Sady  on 

The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building occupa

0

Option 2 and / or Option 3

Retail-CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Ian McCall  on 

Dear LEED Experts, 

I woud like to use Option 3 and Option 2 to achieve the maximum number of point and even an Exemplary level point. 

0
0

Listing the TVOC Ranges

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Summer Gorder  on 

For the CDPH Standard Method v1.2-2017 evaluation In V4 you had to specify the TVOC ranges: 0.5 mg/m3 or less, between 0.5 and 5 mg/m3, or 5 mg/m3 or more.