Forum quick links
Selection of baseline system type for industrial object - Number of floors Vs area
NC-v4 EAp2:Minimum energy performanceposted by Anna Korinkova on
Hello everyone,
Modification of the lighting boundary - 4 lane street
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello everyone,
I would like to ask for a clarification related to the allowed modification of the lighting boundary.
V4 BDC Multifamily Midrise LEED AP Homes point out of reach
NC-v4 INc2:LEED Accredited Professionalposted by Sue Bryant on
The V4 requirement is for a LEED AP Homes to be on the project team. That team member, however, cannot be part of the verification team.
LEED projects registered before April of 2022
posted by Allen Cornett on
Yesterday morning I tried to edit LEED Online forms in several projects. When I clicked on the form a message popped up saying, “Your browser is incompatible or you have chosen to access the
CO2 Sensors for Phonebooths
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hello our project is 3 office floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occu
What threshold of reverberation time to apply for Performing arts Space / ballroom?
NC-v4 EQc9:Acoustic performanceposted by Sara BENLOUBA on
Hi everybody,
GCCA EPD Tool
NC-v4.1 MRc2:Environmental Product Declarationsposted by Celeste Ceballos on
When requesting EPDs to our concrete manufacturer, we were given EPDs generated via the Global Cement and Concrete Association's EPD Tool.
PHIUS for a Commercial High Occupancy Building
posted by Kim Shinn on
We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification. The program includes several high density assembly type spaces - roughly 300 person
Possible to submit a design credit that was pending during desing application at the construction applcation phase?
posted by Sue Bryant on
We have a credit that is pending after the design application.