LE/FE: Mixed-Use Project--Preferred Parking for Retail Too?
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Brooks Critchfield on
We have an urban mixed-use project--about 90% residential and about 10% retail. We are building new parking for the residential units only.
Load calculation and system selection
NC-2009 IEQc7.1:Thermal comfort - designposted by Jatuwat Varodompun on
We got the comment as follow: "However, the supporting documentation to confirm that all design conditions fall within the ASHRAE 55-2004 acceptable ranges has not been provided as required.
Acoustics study
NC-2009 IDc1:Innovation in designposted by Katie Schulze on
I am working on a project where they completed an extensive acoustics study during DD.
Above and Beyond
Pilot-Credits EQpc24:Acousticsposted by Dan LeBlanc on
Is this ID credit approach asking for an effort substantially above and beyond the enhanced credit for LEED for Schools?
views in a Library
NC-2009 IEQc8.2:Daylight and views - viewsposted by Carrie Laurendine on
Im attempting to document the "views" credit in a new library.
Acrylic Concrete Primer
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Nilufer Senses on
I wonder that under which category an "acrylic concrete primer" should be evaluated.
Use of rainwater collected offsite
NC-2009 WEc2:Innovative wastewater technologiesposted by John Covello on
Our project is considering creating a retention pond for rainwater on land adjacent to the LEED project.
All Spaces Excluded
Schools-2009 IEQc8.2:Daylight and views - viewsposted by Caleb Mactavish on
Hello, Our building has only 3 regularly occupied areas, all of which (according to CIRs and previous threads) can be excluded from view calculations.
Common schedule for VAV zones with differing occupancies?
NC-2009 EAp2:Minimum energy performanceposted by Matt Scott on
What's the proper methodology for the following situation? Let's say I'm modeling a building that qualifies for a System #5 VAV baseline system and the four different spaces have different operati