Forum quick links
Massage/Sauna/Swimming pool
NC-2009 IEQc8.2:Daylight and views - viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.
Water Quality
CS-2009 SSc6.2:Stormwater design - quality controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Reference Building – Try #2
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Dirk Kestner on
Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.
50% periouvs paving
NC-2009 SSc7.1:Heat island effect - nonroofposted by Magda Aghababyan on
May be this is a very basic question. But I would like to know from you all, how can we determine whether a open grid paving block is 50% previous or not?
Indoor air quality test methods
NC-v4 EQc4:Indoor air quality assessmentposted by Tyler Zhu on
From my understanding, in order to pass the test for PM2.5 and PM10, EPA Compendium Method IP-10 has to be used.
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater design - quantity controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Integrated Project Team Members
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kim Lombard on
Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital.