G3.1.1 exception d exhaust hood airflow baseline
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
We are looking to use LEED v5 MR Reduce Embodied Carbon Credit as an Innovation Credit
CI-v4.1 IN101:Innovationposted by Donald Green on
What is the expectation in Option #2 for the comparison to a Base Project, Since we have an ID+C Project and there is a high amount of existing walls etc.
Product Certifications - BIFMA Level/GGG, etc
Healthcare-v4.1 MRc7:Furniture and Medical Furnishingsposted by Rachel Thompson on
I am putting together this credit and am not seeing anything obvious around what certifications are needed.
LEED v4 BD+C: SC - Project Information - Site Area
posted by ILDA SHALLO on
We have a LEED project, new addition in an existing school.
Biophilic Design for Recovery
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick on
We frequently implement this pilot/innovation credit on our projects. For our University Athletic projects, we focus on incorporation of biophilic elements in recovery spaces.
Regd. Baseline Systems to be used for Buildings with both Cooling & Heating as per ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
We are having a datacenter project which requires both cooling and heating as the outdoor temperatures vary from -20 degree C to 45 degree C.
Location and Product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lance Kinard on
Hello All,
Regd. night cycle allowed in proposed & baseline energy modelling using ASHRAE 90.1 PRM
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello all,
baseline system selection for building with very different internal gains in different zones.
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi!
Plug loads Process Loads savings vs baseline
CI-v4 EAc2:Optimize energy performanceposted by Xavier Valladares on
Hi All,
Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if