Forum quick links
Move design credits to the construction credit review
posted by Udana Ratnayake on
We are working on a project where the building is to go through a major renovation. renovation is to be carried out floor by floor and the roofing will be done in the later part of the project.
MRc5 for a convention hall with two restaurants
EBOM-2009 MRc5:Sustainable purchasing - foodposted by Iñigo Aizpuru on
Hi, we are analyzing the feasibility of obtaining an EBOM Certificate for a Convention Hall in Spain. In the Hall there are lots of meeting rooms to be rented and 2 restaurants.
Natural Ventilation compliance
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Guillermo T. Adamo on
Hi, We´re working on a project that is pursuing IEQ P1 via natural ventilation. The 4% of ventilation surface required could be achieved using operable windows?
Individual Comfort Controls in a Library
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Kyra Weinkle on
In an academic library setting, has anyone had experience with how to count the workstations provided for library patrons?
Energy Star Equipment
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Ramesh Narayanan on
Dear Sir, One of our project as LEED Commercial Interior (USGBC) which is having the 75% of the area covered by lab and remaining 25% of the area with office.
recycling versus incineration
NC-2009 MRc2:Construction waste managementposted by Jeff Jones on
I am receiving conflicting information regarding landfill diversion documentation and the ability to count materials that are used as a "fuel product" (paid for by waste-to-energy plant), versus bu
Alternative Transportation Survey Results Calculator - Error
EBOM-2009 SSc4:Alternative commuting transportationposted by Tyler Farmer on
I am trying to fill out the LEED user EBOM SSc4 Alternative Tran Results Calculator and I keep getting the same error message.