1 year and 2 year 24 hr design storm

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  sona prajapati  on 

In case 1, we are required to perform a site run off calculation for 1 yr-24 hr design storm and 2 yr-24 hr design storm for both pre- and post- development period.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Aug 25, 2014, 6:43 am

Indoor pool daylighting measurement

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gary Greenshields  on 

We have a Wellness Center project with an indoor pool area of approximately 6,000 SF and a pool surface area of about 4,000 sf within that space.

4
Fri Aug 22, 2014, 8:23 pm

LEED NC 2009 EAc5 Measurement and Verification

NC-2009 EAc5:Measurement and Verification
posted by  Zeb Foss  on 

I am currently training and researching in order to become involved in the M&V process for various new construction buildings within the near future.

3
Default Avatar
Principal
Sustainability Services
LEEDuser Basic Member
26 thumbs up
Fri Aug 22, 2014, 6:10 pm

WEp1 Exemption?

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Cathal Heneghan  on 

Hi I am working on a CI 2009 project in Dublin, Ireland. The project is an office TI involving the bottom 3 floors of a 5 floor building.

3
Fri Aug 22, 2014, 5:09 pm

rainwater calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  ebru unver  on 

lansdcape water calculation montly/daily and rainwater Hello, we are collecting rainwater, so to use at the landscape irrigation and to have addition 2 point.

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Fri Aug 22, 2014, 4:56 pm

Psychrometric Chart and 6.1.1 Documentation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Sangmin An  on 

I am in the process of preparing the documentation for this credit but have a few a few questions regarding ASHRAE 6.1.1 Documentation and associated calculations.

3
Fri Aug 22, 2014, 7:34 am

Modeling a humidifier in the baseline case

NC-2009 EAp2:Minimum Energy Performance
posted by  Gustav Alfaro  on 

Hi, I am working on a data center project under NC 2009.

8
Thu Aug 21, 2014, 8:48 pm

Private Bus Service

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Daniel R Gutierrez  on 

Hi all, We are working on a new factory building in an industrial complex. The complex, located in a rural area is at least six miles away from the city boundary.

2
Thu Aug 21, 2014, 2:27 pm

Rotating Lab Equipment and How to Include It?

NC-2009 EAc1:Optimize Energy Performance
posted by  Brett Beckemeyer  on 

I am currently working on a lab facility which has five labs of varying types.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Thu Aug 21, 2014, 2:24 pm

Glazing ratio

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office spaces

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Aug 21, 2014, 2:03 pm