Meeting EAp2 in Zone 1 without A/C?
NC-2009 EAc1:Optimize Energy Performanceposted by Katrina Morgan on
We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.
some doubts
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Albert Sagrera on
Hi, in our project we have a 60% of the site vegetated, planted with meadow, we have a small impervious surface near the building, and the building itself.
Multiple buildings on a single site
posted by Michael E. Edmonds-Bauer on
We have a project with two independent buildings on a single site.
IEQc4.4
posted by Joel McCreary on
We are not pursuing IEQc4.4 for our project. However, the contractor has stated that we may be able to add it.
FTE MULTIPLE SHIFTS
posted by Diaa Madkour on
We are pursuing LEED NC 2009. We are designing a call centre office building which will be operated 24 hours on three consecutive 8 hours shift work.
Apartment/Dorm
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Tommy Linstroth on
Reading the guidance and from past projects its always been pretty straightforward for showing compliance with an apartment or dorm when every room has an on/off switch.
counting "individual" spaces
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Erica Downs on
Would a private 2-person office count as one space or 2 when calculating the 50%?
Filtration during construction ( MERV 8)
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Sharon Morris on
I am currently working on a project that has a dual HVAC system. A Daikin mini split ductless system and a DOAS Desert Eir system with ducts & filtration.
Large Process Loads from Data Center in Office building
NC-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
We are working with a building where 60% of the annual energy use accounts for process energy due to a large data center.