CS-2009 SSp1:Construction activity pollution preventionposted by Megan Bove on
Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street.
Contained Contaminated Soils & non-ASTM E1527-05 Phase II
NC-2009 SSc3:Brownfield redevelopmentposted by Dana Murdoch on
We have a site with contaminated soils. A Phase II was conducted, but not per ASTM E1527-05 as required.
One story condominium comlplex - tenant specification for LEED
posted by Tom Kennedy on
Hello, Myself and 3 others in the Cincinnati Regional Chapter did an intro to V4 event for chapter members tonight and fielded questions at the end. A gentleman said he wants to generate a tenant d
EA Cr5: Measurement & Verification for projects wherein Option D
NC-2009 EAc5:Measurement and verificationposted by Sasha Peters on
The query is with reference to achieving EA Cr5: Measurement & Verification for projects wherein Option D and Option B of IPMVP Vol.III is not possible. In lieu of same, please confirm if in
Does Seeding Apply
NC-2009 WEc1:Water efficient landscapingposted by Terry King on
Does seeding (hydroseeding) apply toward the needed 5% landscaped area? Thanks
LEED Boaundary and Utility Connections
Schools-2009 PIf4:Schedule and Overview Documentsposted by Larry Turbes on
We're certifying a school addition and the site area associated is fairly straight forward except we have both power and sanitary utility connections that finger out beyond what would be a reasonab
posted signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by yukari kubo on
we are building a campus of buildings (non-school) that has a non smoking policy except in one designated outside area.
FTE in a religious facility
NC-2009 PIf3:Occupant and Usage Dataposted by Donald Green on
I am looking for guidance on how to calculate FTE in a religious facility on a university campus whereby attendees are there for 2 hours each day based on their religion.
Applying for the Exam
posted by Alejandro Camprubi on
When doing the exam registration, although its clear that ....
HVAC system in a core and shell warehouse
NC-2009 EAp2:Minimum energy performanceposted by Isabel Santos on
Dear all, I am developing a simulation of a warehouse (core and shell) that is still under construction. At this stage, it has not yet been defined any tenant.