Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

E-Cloth

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Erin Nuckols  on 

Has anyone heard of a product called E-Cloth? If so, do you know if it meets any of the criteria for this credit?

7
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Fri Apr 25, 2014, 8:25 pm

Full height glass partitions

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Charles Nepps  on 

Would full height glass partitions be calculated both sides as a partition wall, or one side as glazing?

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Fri Apr 25, 2014, 4:45 pm

We are working on food

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Elizabeth Powers  on 

We are working on food production facility and offices. The offices will be in the first two floors of an historic building that the developer is renovating as part of the project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Fri Apr 25, 2014, 3:45 pm

Steel Joists

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  MT A  on 

We have reused and relocated some steel roof joints in an existing building (between additional existing joists to reduce the spans in an area).

3
Default Avatar
Moriyama & Teshima Architects
LEEDuser Basic Member
7 thumbs up
Fri Apr 25, 2014, 3:17 pm

AHU system for industrial production

NC-2009 EAc1:Optimize Energy Performance
posted by  Renaud Gay  on 

I am working on a energy modeling for a relocation industry factory, The entire space is conditioned.

3
Default Avatar
Shanghai Pacific Energy Center
LEEDuser Basic Member
12 thumbs up
Fri Apr 25, 2014, 1:52 pm

Daylight Simulation Modeling Topography

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Kristina Abrams  on 

Our current daylight simulation shows hotspots along a window wall that is shaded by existing trees and topography. We did not model the topography as part of the simulation.

2
Thu Apr 24, 2014, 8:40 pm

90 % of the average annual rainfall

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Lucie Cervena  on 

Could anyone give me an advice which of the following interpretation complies with the credit language?

3
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Apr 24, 2014, 7:00 pm

Option 2 - Labs21

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Alexis Thompson  on 

If our LEED project building is a laboratory space are we required to use Labs21 as our benchmark? I know it's probably the preferred method, but is it possible to use other alternative methods?

2
Director of Sustainability
Iconergy
LEEDuser Basic Member
40 thumbs up
Thu Apr 24, 2014, 6:28 pm

Oversizing the Proposed Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I need to know if both; Basecase and Proposed case should be identical meaning that both should be oversized with the same ratio?

2
Executive Director
Empirical Energy Solutions
LEEDuser Basic Member
23 thumbs up
Thu Apr 24, 2014, 6:07 pm

LEED Schools mandatory for daycare?

LEED Rating System Selection
posted by  Mauricio Ramirez  on 

Hello. I'm about to register a new project for Child Daycare facility.

3
Thu Apr 24, 2014, 5:26 pm