NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.
Existing parking lot, new LEED space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan Reid on
Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.
Bus Instead of Shuttle
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Rachel Manoguerra on
Our project is looking into using a mass transit center that is less than two miles from the project for this credit.
n/a
NC-v4 EQc5:Thermal comfortposted by Anaïs P on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. The building contains new open-office workstations.
Requirement 7 - Windows in the Stairs
Pilot-Credits EQpc78:Design for active occupantsposted by Douglas Flandro on
Do the windows in the stairways need to be 8 square feet at each level? I have a 3 story stairwell with a narrow window that runs the length of the stairs. It is 19 feet by 1 foot.
Tree-Lined Blocks
ND-v4 NPDc14:Tree-lined and shaded streetscapesposted by Martine Desbois on
Hi Elliot, Do pedestrian only or bicycle paths, being part of the circulation network, be included in the calculation for block length under Tree-Lined Blocks. Thanks
Exterior Metal Halides
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by Dianne Herrin on
We are working on a V4 BD+C Healthcare Project, and we're completing the Source Reduction Calculator for the M&R Credit PBT Source Reduction-Mercury.
CS v2009 Appendix 4 - Lease and Sales agreement
posted by Becky Stumm on
I have a project that the owner/landlord are seeking LEED-CS certification, but none of the tenants have any interest in seeking LEED-CI certification.
Regularly Occupied Spaces
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular
historic district
NC-v4 LTc3:High priority siteposted by sepideh khodadadi on
can anyone explain historic district? i don't exactly know what that is