PC 25 Water Metering and Reporting- Feedback

Pilot-Credits PC25: Water Metering and Reporting
posted by SOFIA KESIDOU on Mar 18, 2013, 6:51 am

The pilot credit aligns with the overall direction and advancement of LEED and compliance with this credit spurs market innovation/transformation. The projected annual water use calculations for...

Sharing water usage data

Pilot-Credits PC25: Water Metering and Reporting
posted by Tapio Peltonen on Apr 26, 2012, 2:24 am

This comment applies to Project ID 1000010605 with Pilot Credit 25 - Water Metering & Reporting:
The credit requires sharing water usage data from all submeters in the project with...

Last reply: Batya Metalitz, Sep 4, 2012, 3:02 pm

Water Flow Diagram

Pilot-Credits PC25: Water Metering and Reporting
posted by Donald Bauman on Apr 5, 2012, 11:53 am

This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering:

•The credit requires us to submit a water flow diagram indicating all sources and...

Last reply: Kimberly Frith, Apr 5, 2012, 12:48 pm

Meter for Boilers

Pilot-Credits PC25: Water Metering and Reporting
posted by Orlin Velinov, PE on Dec 6, 2011, 6:21 pm

threefold question:
1. Does this include heaters/boilers for domestic hot water system that exceeds the specified capacity y water consumption. We have a hotel project where the hot water...

Meter Capabilities?

Pilot-Credits PC25: Water Metering and Reporting
posted by Kimberly Frith on Sep 21, 2011, 3:55 pm

The credit submittals require "product data indicating meter has capabilities of meeting prerequisite requirements", but the credit language does not specify requirements for the meters...

Last reply: Lonny Blumenthal, Nov 16, 2011, 9:49 am