Topic

Integrative process

Pilot-Credits PC60: Integrative process
posted by Habitech Distretto Tecnologico Trentino on Apr 3, 2015, 6:56 am

I find this credit really interesting and it is very important to have this as a prerequisite for LEEDv4

Last reply: Helene Lefkowitz, Nov 18, 2016, 1:20 pm

Integrative Process-Value Engineering

Pilot-Credits PC60: Integrative process
posted by Susan Coy on Jun 17, 2015, 10:51 am

Do you use Value Engineering in documenting this process?

Last reply: Glen Phillips, May 23, 2016, 8:18 pm

Integrative Pilot Credit- Design or Construction Credit

Pilot-Credits PC60: Integrative process
posted by Devki Wright on May 23, 2016, 7:50 pm

Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?

Last reply: Glen Phillips, May 23, 2016, 8:12 pm

Cost Analysis?

Pilot-Credits PC60: Integrative process
posted by Crina Bosch on Feb 19, 2015, 11:51 am

Thinking about pursuing this credit as an innovation for a LEEDv2009 Schools project. I'm confused about the requirements, however.

The pilot credit has a requirement for cost analsyis...

Integrative Process

Pilot-Credits PC60: Integrative process
posted by Janna Alampi on Feb 25, 2014, 5:26 pm

Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project. Is there any talk of this becoming a standard credit, or possibly a...

Last reply: Heather DeGrella, Mar 6, 2014, 1:10 pm

Whole System Integration Process Guide not referenced

Pilot-Credits PC60: Integrative process
posted by Heather DeGrella on Aug 7, 2012, 6:39 pm

Does any body know why this pilot credit does not use the reference standard, titled “ANSI/MTS Whole System Integration Process Guide (WSIP)-2007 for Sustainable Buildings and Communities.” It...

Last reply: Batya Metalitz, Aug 8, 2012, 10:52 am