Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LDP

Discuss the LEED Dynamic Plaque and Arc
posted by  Meier Corporate Account  on 

As hard as LEED certification is for a manufacturing facility, LDP was nearly impossible. I did the 30 day trial and never achieved a score higher than 8.

0

Trying to get EQc1 without installing a visible alarm

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ira Ben-Reuven  on 

We are working to certify a NC. The tenants will not allow us to install a alarm in the presence of the customer.

1
Tue Dec 13, 2016, 4:42 pm

100% OA constant volume enthalpy heat recovery ventilator

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Noriko Nagazumi  on 

Hi, Our project is mechanically ventilated by 100% OA constant volume enthalpy heat recovery ventilator.

1
Thu Jan 26, 2017, 3:45 pm

Non potable water source offsite

NC-2009 WEc1:Water Efficient Landscaping
posted by  Mario S.  on 

Our Project is a NC, part of a university campus. The campus is supplying the project with the pipeline for irrigation. all the water supplied by the campus is Non-potable / reused water.

1
Sat Feb 4, 2017, 1:17 pm

Preferred Parking Spaces Allocation

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Mario S.  on 

Our project is a new shopping mall that includes retail shops, a supermarket, and restaurants. All parking spaces are located in basement floors (basement 1 to 6).

1
Mon Dec 12, 2016, 6:14 pm

Addition to Existing Leed EBOM Building

General forums
posted by  Max Neu  on 

Forgive me if this has been answered, I searched all over and can't find a definitive answer.

0

Lighting power allowance calculations for V4 ID+C Retail

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Joanna Peacock  on 

According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For

1
Wed Jan 18, 2017, 11:46 pm

Final Report

NC-v4 EAc1:Enhanced commissioning
posted by  Colin Grist  on 

Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin

1
Tue Dec 13, 2016, 6:32 pm

renovation of multiple non-contiguous parts of an office

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  Agnieszka Rylska  on 

The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.

0

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1
Tue Dec 13, 2016, 9:56 pm