Modified Prerequisite
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Markus. We are planing to use LEED-CS Revised points thresholds based in Owner Energy percentage.
Contract between the Owner and the CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Mohamed M. Abd Elhameed on
For pursuing EAc3, the contract between the owner and the CxA ensuring CxA involvement in post-construction shall be uploaded through LEED Online credit form.
number of working days
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Emmanuel Pauwels on
We are surveying building occupants which consist of 2 groups. Group A of the building occupants works 5 days per week. Group B has a 6 day workweek.
Material SRI
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Mohamed Hesham on
i'm participating in a LEED ebom project where the construction was completed in 1990 , the roof tiles are white terrazzo tiles but we can't get any data or documentation from the manufacturer , is
Floor Coatings
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Guillermo Hernandez Espinoza on
Hello. It is necessary to document the floor coatings in the IEQc4.3?
Natural ventilation of interior rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ritwik Kakati on
We have a multifamily building where the naturally ventilated kitchens are interior rooms, located next to the living/dining rooms that have operable windows.
Open Space Offset
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Gabriela Crespo on
Dear Forum, We are working on a project where the open space is very limited.
group certification - exclude an existing building
posted by Michela Tedeschi on
We are investigating if group certification approach may be suitable for a project that include within the same LEED boundary the following buildings: - n1 Existing Building (Energy House) that wa
Design Condition
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Jerry Scott on
I assume both Vpsd and Vdzd should both be taken at a set design condition (cooling or heating).
IEQ 4.3 - Mineral-based without integral organic based coatings
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lilian Seow on
Can someone explain that statement in another way? I am trying to explain what that means to tile supplier/manufacturer in China for them to provide a letter.