Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Above ground-floor horizontal exterior spaces (plaza, roof)

NC-v4 SSc6:Light pollution reduction
posted by  Jill Perry, PE  on 

Forgive me if this was covered elsewhere but I couldn't find it.

1
Thu Jun 8, 2017, 2:40 pm

Demand Response on Campus applied to CI (2009) project?

NC-v4 EAc4:Demand response
posted by  Margaret Montgomery  on 

We're doing a project that is >75% of the interior of the building (nearly all of it), but is considered CI.

1
Mon Aug 28, 2017, 1:01 pm

EPD for Products + installation Materials, all as one?

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Len Sciarra  on 

If we have a ceramic tile wall, do we count the EPD's (if we could get them) for the Tile separate from the Thinset and the Grout, or would all three products be considered as 1 EPD?

1
Sat Aug 26, 2017, 6:47 pm

Access to quality transit

NC-v4 LTc5:Access to quality transit
posted by  Subrota Roy  on 

Hi, I want to know clearly what is Access to quality transit? Also how can i achieved this credit point for LEED NC v4. Pls share with me compliance path,what type of documentation needed?

1
Thu Jun 8, 2017, 1:28 pm

Basic Difference between LEED V3 & LEED V4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Subrota Roy  on 

What is Basic Difference between LEED V3 & LEED V4 ? What things has been incorporated in LEED V4?

1
Sat Aug 26, 2017, 12:45 pm

Low Emitting Products

Homes-v4 EQc7:Low-emitting products
posted by  Jess Harris  on 

Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.

1
Sat Aug 26, 2017, 2:40 pm

New and Renovation: How to Determine Points from Table 1

NC-v4 EAc2:Optimize energy performance
posted by  James Keohane  on 

I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.

1
Fri May 26, 2017, 1:46 pm

Doubts in Green power & REC

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the

1
Fri May 26, 2017, 3:24 pm

working in certified campus

LEED Guidance for Campuses and Multiple Buildings
posted by  sara m  on 

if I am working on a new project that will be located in a gold certified campus; does it mean the new project will be gold certified?

1
Fri May 26, 2017, 6:30 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm